TR Instandhaltung has brought about a lasting change in the planning of concrete repairs. Clear requirements for construction products, systems and verification ensure greater safety and quality, but at the same time place higher demands on documentation and planning. What does this mean in practice?
We discuss this with our Product Manager for concrete repair, Alexander Jurecka, who has been involved in developing the implementation of the standard into day-to-day practice at StoCretec right from the start.
As early as 2025, in our seminar series ‘StoCretec Partner Days’ and ‘StoCretec Dialog Days’, we were already addressing questions such as ‘How will the handling of serviceability verification in accordance with TR Maintenance be structured in future?’, “What is a DIBt report and how should it be handled?”, “Are there alternative forms of verification?”, and “Structural stability-related repair – which systems should be used?”
In a recent interview, Alexander Jurecka once again provides key answers.

Question: What is the significance of the TR on Maintenance for the planning of concrete repair works?
Answer: This set of regulations has fundamentally changed the planning process. It sets out clear requirements for construction products, systems and the verification of their performance. For planners, this means greater certainty, but at the same time higher demands on documentation and the early consideration of standard requirements. This is clearly evident in practice: in addition to the traditional technical data sheets, system verifications, declarations of performance and test reports, so-called ‘suitability verifications’ must now be taken into account.
As a result, documentation in accordance with standards is becoming a greater focus than ever before, right from the planning phase.
Question: How has StoCretec adapted to the new requirements?
Answer: We have systematically aligned our product range with the requirements of the TR Maintenance standard, offering tested systems, fully prepared verifications and practical support for designers and application specialists. The aim was to make it as easy as possible for everyone involved in the construction process to implement the new requirements.
Question: Why have the project-specific verifications been replaced by the new forms of verification?
Answer: The aim is to establish uniform and comparable standards. Individual and project-specific verifications were often time-consuming and difficult to follow. Standardised forms of verification ensure quality and make the planning process more transparent.
Question: How does StoCretec support designers and contractors in providing the necessary verifications?
Answer: We provide those involved in the construction project with documentation packages containing all relevant verifications. This includes documentation on national and European suitability for use and declarations of conformity, plus the necessary European certification for the manufacturing plant. This is accompanied by details on application and installation guidelines in accordance with TR Instandhaltung. Providing all this information in a single package ensures maximum transparency and efficiency. Planners and contractors save time, reduce risks and sources of error, and can be confident that all requirements are fully met.
Personalised technical advice, training courses and direct support during the planning phase are also part of the services we offer to facilitate the implementation of the requirements.
Question: What are the risks if verifications are missing or incomplete?
Answer: This can lead to significant problems – ranging from delays in the construction process to legal risks. In the worst-case scenario, the application may not be approved or liability issues may arise.
Question: How can planners ensure, right from the early stages of a project, that all requirements are met?
Answer: It is crucial to incorporate all relevant specifications at an early stage and to select tried-and-tested systems. Using comprehensive documentation packages and liaising with producers such as StoCretec helps to prevent problems arising later on.
Thank you very much, Alexander, for the interview!